Most people see a finished claw machine and assume it was always that way. But behind every machine is a design and manufacturing process that takes weeks — from initial concept to the finished kit that arrives at your door. Here’s how we do it at Hiclawcrane.
Stage 1: Concept & Market Research
Every new machine starts with a question: what do operators actually need? Our product team researches:
- Operator feedback from existing customers
- Market trends in key regions (US, UK, EU, Southeast Asia)
- Prize size trends and cabinet size requirements
- Competitor analysis and gap identification
From this research, we define the machine’s core specifications: cabinet size, gantry dimensions, prize window size, and target price point.
Stage 2: Engineering & CAD Design
Our engineering team creates detailed CAD drawings for every component:
- Cabinet shell dimensions and panel layout
- Gantry rail system and motor mounting positions
- Claw mechanism geometry and drop distance
- Wiring harness routing and connector positions
- Prize chute angle and delivery mechanism
CAD files are reviewed multiple times before any physical prototyping begins.
Stage 3: Prototype Build
The first physical prototype is built by hand using CNC-cut components. This prototype is used to:
- Verify all dimensions and tolerances
- Test claw movement range and accuracy
- Validate prize delivery mechanism
- Identify assembly issues before mass production
Prototypes typically go through 2–3 revision cycles before being approved for production.
Stage 4: Control Board Development
Our PCB team develops or adapts the control board firmware for each new machine model:
- Claw strength control algorithm
- X/Y/Z axis movement timing
- Coin and token acceptance settings
- Operator menu parameters
- Prize detection logic
Each board is tested on the prototype before being approved for production.
Stage 5: Component Sourcing & Quality Control
We source components from verified suppliers and inspect every batch:
- Steel: thickness and hardness testing
- Acrylic: clarity and scratch resistance
- Motors: torque and RPM verification
- PCBs: electrical continuity and function testing
- Coin acceptors: calibration and acceptance rate testing
Stage 6: Mass Production
Approved designs move to our production line:
- CNC cutting and bending of steel frames
- Powder coating or painting
- PCB assembly using SMT production lines
- Mechanical assembly by trained technicians
- Full QC inspection of every unit
Stage 7: Kit Packaging for Shipping
For DIY kit orders, machines are disassembled into kit form:
- Components grouped and labeled
- Foam padding and corner protectors added
- Assembly manual included
- Export carton prepared with customs documentation
OEM & Custom Orders
The same process applies to OEM and custom orders, with additional steps for custom branding, color, and design. Lead times for custom orders are typically 25–60 business days depending on the level of customization.
Frequently Asked Questions
Can I request a custom machine design?
Yes — we offer full ODM services for custom cabinet designs. Minimum order quantities apply. See our OEM / ODM Services page for details.
How long does it take to manufacture a custom order?
Standard OEM (branding only): 15–25 business days. Custom color/graphics: 25–35 days. Full ODM design: 45–60 days.
Can I visit the factory?
Yes — factory visits are welcome for qualified wholesale and OEM customers. Contact us to arrange a visit.
Related Resources
- OEM / ODM Services — Custom branding, cabinet design, and bulk manufacturing
- How Are DIY Claw Crane Kits Manufactured? — Step-by-step factory process for kit production
- Wholesale Inquiry — Factory-direct pricing for bulk orders
- Browse Claw Crane Machines — Our full range of machines